Azure Electrical Ltd supported Thomas Tallis School with the electrical infrastructure required for a new roof-mounted chiller unit, including heavy-gauge tray work, a 70m SWA cable run, separate earthing and safe roof access provisions.

Ready for some upgrades?

Call Azure Electrical or fill in our contact form to arrange a visit today.

Project Overview

Azure Electrical Ltd was appointed to deliver the electrical infrastructure required for a newly installed chiller unit at Thomas Tallis School.

The new chiller was positioned on the roof of the school, which meant the project required a safe, durable and well-planned cable route from the main intake room through to the roof plant location.

Our works included the installation of new 300mm heavy-gauge tray, a 70m run of 95mm 5-core SWA cable, a separate 50mm earth and a new GRP step to provide safe access over the tray work.

This project demonstrates Azure’s experience in delivering practical electrical installation works for education environments, where safety, access, coordination and long-term reliability are essential.


Scope of Works

The project included:

  • Installation of new 300mm heavy-gauge cable tray

  • Tray route installed from the main intake room to the roof-mounted chiller location

  • 70m of 95mm 5-core SWA cable installed for the new chiller power supply

  • Separate 50mm earth installed as part of the supply arrangement

  • Heavy-gauge tray mounted on new rubberised mounting feet

  • New GRP step installed to create a safe route over the tray work

  • Electrical infrastructure delivered to support the new roof plant installation

The works were completed with a focus on safe routing, durable containment and future maintainability.


Supporting a New Roof-Mounted Chiller Unit

The newly installed chiller required a reliable power supply capable of supporting the demands of the roof plant.

Azure installed a robust containment route using 300mm heavy-gauge tray, allowing the SWA cable and separate earth to be installed safely and securely across the required route.

Because the installation was located on the roof, careful attention was given to cable support, access, tray mounting and safe movement around the plant area.

The addition of the GRP step helped create a safer route over the tray work, reducing the need for staff or contractors to step directly across the containment.


Why the Installation Matters

For a school environment, mechanical plant such as chillers plays an important role in keeping the building comfortable and operational.

The electrical infrastructure behind that plant needs to be:

  • Safe

  • Durable

  • Properly supported

  • Suitable for the load

  • Accessible for future maintenance

  • Installed with the building environment in mind

This project was not simply about running a cable. It required a planned installation route, suitable containment, safe access over the tray and coordination with the new chiller unit on the roof.

Azure’s experience across electrical installation and education sector works meant the project could be delivered with the right balance of technical planning, site safety and practical installation detail.


Working in an Education Environment

School projects require a careful approach. Work must be planned around access, safety, building users and the long-term operation of the site.

At Thomas Tallis School, the installation supported essential building services while keeping the finished route clear, structured and maintainable.

Azure regularly supports education clients with electrical installation, compliance-led works, remedial works and planned maintenance.


Project Outcome

Azure Electrical Ltd successfully installed the new electrical supply infrastructure for the school’s roof-mounted chiller unit.

The completed works provided:

  • A robust heavy-gauge containment route

  • A 70m SWA cable run from the main intake room to the chiller

  • Separate earthing provision

  • Safe roof tray mounting on rubberised feet

  • Improved access over the tray with a new GRP step

  • Electrical infrastructure ready to support the new chiller installation

This project highlights Azure’s capability in delivering commercial electrical installation works that support mechanical plant, education buildings and long-term site operation.

Powering essential building services for an education environment with safe, robust and carefully planned electrical infrastructure.

Powering essential building services for an education environment with safe, robust and carefully planned electrical infrastructure.

Powering essential building services for an education environment with safe, robust and carefully planned electrical infrastructure.

  • Roof-mounted tray installation
  • Roof-mounted tray installation with cables running along it

Ready for a full rewire?

Call Azure Electrical or fill in our contact form to arrange a visit today.